If you need to save a copy of the video to your computer, you can click the blue DOWNLOAD VIDEO button and a copy of the video file will be downloaded to your hard drive. The file is an mp4 file in 720p HD format (suitable for projection to a large screen) and will take some time to download. Please be patient.

If you experience any problem with either option please use the CONTACT FORM to get in touch with EverTechnology for personal assistance.

Broadmeadow Battery Electric Vehicle for UG Coal

Dave Zanette
Project Supervisor, BMA

Andrew Batterson
BMA Engineering

The Broadmeadow Battery Electric Vehicle project was initiated to address the residual Similar Exposure Groups (SEG) exposure to Diesel Particulate Matter (DPM).

Over the last 3 years, Broadmeadow (BRM) has successfully completed a number of projects to reduce occupational exposures to DPM for the underground SEGs. These initiatives have resulted in ongoing improvement to the mine’s total exposure profile, which we understand is now approximately one third of most other underground coal mines in Queensland.

After exhausting all options for a suitable lower emissions diesel engine package options for underground personnel transporters BMA initiated an aggressive schedule for implementation of an underground battery electric personnel transporter.

With the local market opportunities exhausted, the BRM team sourced international suppliers with previous experience in manufacturing electric personnel transporters. A supplier was selected and a commitment to implement a surface trial was to commence in FY19.

Broadmeadow set up and implement a team to carry out the FAT testing and trial of the vehicle, the trial included but not limited to determining all required safety, legislative, performance and failure modes required by stakeholders for the trial to be successful. In the back ground the engineering team and supplier conducted the necessary detailed assessments and engineering modifications against current Australian Standards and legislation for the suitability of implementing an underground trial.

BRM has successfully completed surface and underground trials proving the safety, reliability and performance of a battery electric vehicle whilst also validating the extremely low operating cost.

The next phase of the project is to implement full production trials by removing all diesel powered personnel transporters from a development section of the mine to validate the DPM exposure reductions.